[Image]
![]() Looking inside of the Swan Creek Valve Vault, south of Swan Creek Rd. along Route 210. |
[Image]
![]() |
[Image]
![]() Contractor installing 60” fiberglass reinforced pipe 17ft below grade inside of 8ft trench boxes south of Old Fort rd. along Route 210. |
[Image]
![]() Contractor installing two 48” 45 degree bends to achieve proper alignment into the next vault south of Old Fort Rd. along Route 210. [Image]
![]() The 60” tunnel boring machine (TBM) dubbed the Broad Creek Brawler, holes through on the North Bound side of Route 210. |
Meet the “Broad Creek Brawler” the micro tunnel boring machine currently boring a tunnel on the west side of MD 210 south of Swan Creek Road. The tunnel will end at the Broad Creek Wastewater Pumping Station.