[Image]
![]() Inside view of an intermediate jacking station within the tunnel. This is used to help move the pipe string along in addition to the main jacks at the shaft. |
[Image]
![]()
|
Contractor makes final connections inside part of a valve vault. |
Placing fabric and surge stone over installed pipe to aid in storm water management located along Route 210. |