Plan Review Information

Plan Review Staff

Staff
Ted Podles (Supervisor)
Angelo Prevezanos 
Damon Johnson
Fabian Becerra
Chris Imhof
David Bailey


Plan Review General Inquiries:
 

Phone Number
301-206-8607
301-206-8604
301-206-8524
301-206-8605
301-206-8514
301-206-8455


301-206-8886 or
1-800-828-6439 ext 8886
 

Email Address
Ted.Podles@wsscwater.com
Angelo.Prevezanos@wsscwater.com
Damon.Johnson@wsscwater.com
Fabian.Becerra@wsscwater.com
Christopher.Imhof@wsscwater.com
David.Bailey@wsscwater.com


PlumbingPlansReview@wsscwater.com

Back to Top

Plumbing and Gasfitting Plans

Plumbing and Fuel Gas plans are required for all commercial construction. The code official shall have the authority to waive submittal requirements under certain conditions. Typically, commercial work with ten (10) or less plumbing fixtures and/or three (3) or less gas appliances, may be waived.

However, Plans shall not be waived for the following scenarios:

  • Food Service Establishments due to necessary Fats, Oils, and Grease (FOG) abatement evaluation 
  • Fuel gas system with greater than three (3) appliances on the entire gas system (existing plus new).
  • Shell building construction
  • Any building with new or upgraded water, sewer, or metering scheme 

Submittal Requirements (to Plumbing Plan Review office):

Announcement | Checklist | Reminder

Plans shall include floor plans to scale, schematics for fuel gas, waste and vent and water piping riser diagrams, and where appropriate, such details as meter room layout, equipment schedules, backflow prevention device details, elevations and site plans, material and fixture specifications, fixture clearances etc. Submittals will be accepted from a registered WSSC Water Master Plumber / Gas Fitter or from a Registered Maryland Professional Engineer (PE).

ELECTRONIC PLAN SUBMITTAL:

An applicant must first apply for a Long Form Plumbing /Fuel Gas Permit via WSSC Water’s electronic permit system called ePermitting. The electronic permit app will be reviewed by the Permits Services Section, then forwarded to the Plans Review office. Plans Review staff will determine if plans are required and will assign a plan number. When the plan number is assigned, an email will be sent to the applicant (Plumber or Engineer), to let them know plans can be uploaded into E-Plan Review. 

  • Where only the Master Plumber/Gasfitter was designated on the permit application, the plumber will receive the Applicant Upload email and only that designated licensee can upload into ePlan Review.
  • Where a “Plans Submitter” was designated on the permit application, the Plans Submitter will receive the Applicant Upload email and only the Plans Submitter can upload into ePlan Review. The licensee may only view the project.
  • Where an engineer will be submitting on behalf of a project, they must be selected as a Plans Submitter on the permit application in order to upload; see the previous bullet for instructions.
  • New Users: the initial email you receive for the ePlan Review system will include a temporary password to allow you to register.
  • Plan Status -Emails with the plan review status will be sent automatically as we review the plan. When the plan status is approved, the Plans Reviewer will also approve the permit application and return it to Permits Services for “Final Processing”. Typically, the applicant will receive their next notification from the ePermitting system that the permit application is “Awaiting Payment”
  • ePlan Review Help/Resources -  ePlan Review tools, resources and instructions can be found on the ePlan Review or access via the following links:

PAPER PLAN SUBMITTALS: 

Paper based submittals are no longer allowed. Become familiar with the benefits your peers are already enjoying and become eco-friendly while doing so.

Note: Beginning Sept 1, 2019, all projects requiring a plan review shall be submitted electronically for plan approval.

Refer to Electronic Plan Submittal Guidelines above.

PLEASE NOTE - PERMIT APPLICATIONS WILL BE CANCELED IF REQUIRED PLANS ARE NOT SUBMITTED WITHIN 30 DAYS OF PLAN NUMBER ASSIGNMENT.