alert
Concerned about cyclosporiasis?
1784143162

Our drinking water is safe.

close
alert
Residential Water Service Disconnections have resumed
1781296197
close
alert
Regional Drought Watch
1780510546
close

Miscellaneous Fees and Charges

WSSC Water provides a number of services for which separate fees or charges have been established. Recent review of the costs required to provide these services indicates a need to change the amounts charged for some of the services. The fee and charge listed below are to be effective July 1, 2026.

Inspections, Licenses and Permits

Charge Number and NameFY 2027 Approved Fee
1A Inspection Fees - Water/Sewer Connection Hookup, Well/Septic Hookup,
Plumbing and Gas-fitting Inspections
-
Plumbing and Gas-fitting Inspections-
New Single Family Detached Dwellings and Townhouses1,800
New Attached Dwellings (townhouses/multiplex excluding apartments)1,800
All Other Residential-
Water/Well Hookup180
Meter Yoke Inspection (meter only installation)180
Water Hookup Converting from Well (includes 2 inspections)360
Sewer/Septic Hookup180
First Plumbing Fixture180
Each Additional Fixture90
SDC Credit Fixture Inspection (per fixture)75
Minimum Permit Fee320
Permit Reprocessing Fee90
Long Form Permit Refund Fee320
Long Form Permit Re-Issue Fee320
All Non-Residential-
Plan Review without Permit Application-
25 Fixtures or Less780
26-200 Fixtures3,910
Over 200 Fixtures9,390
2nd or 3rd Review (with or without permit application)-
25 Fixtures or Less315
26-200 Fixtures885
Over 200 Fixtures2,250
Water/Well Hookup335
Meter Yoke Inspection (meter only installation)335
Sewer/Septic Hookup335
FOG Interceptor-
First Plumbing Fixture335
Each Additional Fixture90
SDC Credit Fixture Inspection (per fixture)85
Minimum Permit Fee465
Permit Reprocessing Fee90
Other Services-
Permit Consulting Fee180
1B Long Form Permit Refund Fees-
Long Form Permit Refund Fee465
Long Form Permit Re-Issue Fee465
2 License Fees for the Regulated Trades-
Reciprocal Master License (Plumber, Gasfitter, Plumber/Gasfitter):-
Initial Registration for a license (for 2 years)160
Registration Renewal (for 2 years)130
Late Registration Renewal80
Examined Master License (Plumber, Gasfitter, Plumber/Gasfitter):-
Initial Registration of a License (for 4 years)175
Registration Renewal (for 4 years)175
Late Registration Renewal85
Cross-connection Technician Registration45
Sewer and Drain Registration and Renewal (for 2 years)75
Sewer and Drain Late Renewal Fee40
Journeyman License Registration-
Initial Registration per type (for 2 years)60
Registration Renewal (for 2 years)60
Late Registration Renewal40
License Transfer Fee35
License Replacement Fee30
Apprentice License Registration:-
Apprentice License Registration (Lifetime)20
3 Short Form Permit Fee for Initial, Reinspection and Reactivation Types (Up to 3 fixtures and Non-Refundable)180
4 Long Form Permit Transfer Fee (with inspection)265
5 Tapper License Fees-
Permit Fee420
Duplicate60
6 Watershed Use Permit Fees-
Boat Removal and Impoundment Fees-
Boat/Craft Removal and Impoundment Fee150
Removed Boat/Craft Storage Fee (Monthly)90
Watershed Use Permit Fees-
Watershed Use Permit (January 1-December 31)70
Watershed Use Permit (Single Day)5
Open Season Boat Mooring (March 15 - November 30)90
Winter Boat Mooring (December 1 - March 14)75
Azalea Garden Rental (4 hours)75
Bio-Brick Pavilion Rental (4 hours)100
Boarding Stable Entrance Permit (Single Day)260
Adjacent Landowner Entrance Permit (Single Day)80
Picnic Permit-
Picnic Permit - Groups of 1-5 Persons (Single Day)5
Picnic Permit - Groups of 6-10 Persons (Single Day)10
Picnic Permit - Groups of 11-15 Persons (Single Day)15
7 Site Utility Inspection Fees (Non-Minor) / DRP-DR Developer-
Base Fee5,810
Pipeline (per foot)12

Discharge and Water Protection

Charge Number and NameFY 2027 Approved Fee
8 Water Hauler Permit Fees-
Discharge Permit Fee (Sanitary/Septage/Grease):-
1-49 gallons (per vehicle)255
50-799 gallons (per vehicle)8,170
800-2,999 gallons (per vehicle)25,550
3,000 gallons & up (per vehicle)42,050
January thru June (50% of discharge permit fee)50% of fee
Waste Hauler Discharge Permit Transfer Fee225
Industrial/Special Waste Disposal Fee (per 1,000 gallons)405
Zero Discharge Permit Fee225
Sewer Rate - Hauled Waste (1,000 gallons of truck capacity)-
9 Industrial Discharge Control Program Fees By Category-
Industrial Users Subject to Categorical Pretreatment Standards-
Less than 5,000 gpd (double visit)9,910
Greater than 5,000 gpd (double visit)15,180
Non-Discharging Categorical Industries (zero discharge)2,675
Significant Industrial Users-
Less than 25,000 gpd (single visit - priority pollutant sampling)9,910
Greater than 25,000 gpd (double visit - priority pollutant sampling)15,180
Penalty Charge for Late Fee Payment5% of fee
10 Discharge Authorization Permit Fees-
Significant Industrial User - Initial Permit (for 4 years)11,785
Significant Industrial User - Renewal (for 4 years)5,780
Zero-Discharge Initial CIU Permit (for 4 years)4,470
Zero-Discharge Renewal CIU Permit (for 4 years)2,980
Temporary Discharge Permit (non-SIU)11,785
11 Discharge Fees - Food Service Establishment-
Full Permit FSE855
BMP Permit FSE265
12 Cross-Connection Fees-
Test Report Fee (per report)65
Base Fee for High Hazard Commercial Water Customer (per month)30
Base Fee for All Other Commercial Water Customer (per month)15

Meters and Related Services

Charge Number and NameFY 2027 Approved Fee
13 Small Meter Replacement Fee (at Customer Request)245
14 Meter Replacement Fees (Damaged or Stolen Meter)-
5/8" w/ touch pad (inside w/remote)220
5/8" w/ pit pad (outside w/o remote)220
5/8 Meter - pad encoder150
5/8" x 3/4" w/ touch pad (inside w/ remote)220
3/4" w/ touch pad (inside w/ remote)255
3/4" w/ pit pad (outside w/o remote)255
1" w/ touch pad (inside w/ remote)310
1" w/ pit pad (outside w/o remote)320
1" Kamstrup Meter, UT370
1 1/2" Badger Flanged Meter-
1 1/2" Flanged Meter905
1 1/2" Nipple Meter810
2" Flanged Meter1,080
2" 15 1/4 Flanged Meter1,325
3" Compound Meter2,250
4" Compound Meter3,300
6" Compound Meter5,290
Turbine, Horizontal 3" Neptune w/ pit pad1,490
Turbine, Horizontal 4" Neptune w/ pit pad1,990
Turbine, Horizontal 6" Neptune w/ pit pad3,970
2" Hersey MVR Turbine1,020
3" Hersey MVR Turbine2,845
4" Hersey MVR Turbine3,975
6" Hersey MVR Turbine4,880
2" Detector Check4,920
4" Detector Check4,260
6" Detector Check4,910
8" Detector Check6,280
10" Detector Check7,715
12" Detector Check23,805
4" Fire Service Meter9,430
6" Fire Service Meter11,480
8" Fire Service Meter16,480
10" Fire Service Meter15,980
12" Fire Service Meter21,995
5/8" Ultra Sonic505
5/8" Ultra Sonic Spuds505
3/4" Ultra Sonic585
3" Octave UT L=243,145
4" Octave UT L=29/ L=334,160
6" Octave UT5,810
4" Octave FM4,405
6" Octave UT L=456,110
8" Octave UT L=5310,965
10" Octave UT L=6814,445
15 Meter Testing Fees-
5/8" to 1"330
1-1/2"530
2" and up585
16 Sub-Meter Installation Fees-
One-time Sub-Meter Charge - Small300
One-time Sub-Meter Charge - Large610
One-time Inspection Fee320
17 Water Turn-Off, Turn-On Fees-
A. Customer Requested - Water Turn-Off, Turn-On Fees-
Small Meter Turn-Off70
Small Meter Turn-On105
Large Meter Turn-Off240
Large Meter Turn-On275
B. WSSC Water Scheduled Action - Water Turn-Off, Turn-On Fees-
Small Meter Turn-On155
Large Meter Turn-On485
18 Call Back Fee (small meters, plumbers)125
19 Call Back Fee (large meters, plumbers)445
20 Missed Appointment Fees for Meter Servicing/ Restoration of Service-
First Missed Appointment or Restoration of Service Turn-On160
Each Additional Missed Appointment160
21 Meter Reinstallation Fee445
22 Sewer Meter Maintenance Fee (per year)22,675
Quarterly Calibrations (per quarter)5,670
23 Property Inspection Fee-
24 Warehouse Restocking Fee110

Fire Hydrant Services

Charge Number and NameFY 2027 Approved Fee
25 Temporary Fire Hydrant Connection Fees-
3/4" Meter - Deposit-
3/4" Meter Deposit525
3" Fire Hydrant Meter - Deposit-
3" Fire Hydrant Meter Deposit3,080
Service Charge-
2 Weeks or Less (3/4" meter)-
2 Weeks or Less (3" meter)-
3/4" Meter and 3" Fire Hydrant Meter220
Water Consumption - 3/4" MeterTier 4 ADC rate per 1.000 gallons
Water Consumption - 3" Fire Hydrant MeterTier 4 ADC rate per 1.000 gallons
Daily rental rate after expiration of permit10
Fee on Unpaid Temporary Fire Hydrant Billings1.5% per month
Loss/Destruction of MeterForfeiture of Deposit
Loss/Destruction of Wrench40
26 Truck Inspection Fee with Attached Fire Hydrant Meter (for 2 years)60
27 Fire Hydrant Flow Test Fees-
No Current Test780
Current Test80

Development Services

Charge Number and NameFY 2027 Approved Fee
28 Feasibility Review Fees (WSSC Water Built)-
Feasibility Submission Fee (non-refundable)2,605
Feasibility Review & Report Fee Deposit
(can be deferred as deficit when extension is completed)
23,115
29 Construction Services Fee9.3% of WSSC Water's unit cost estimate or
12% of contractor's cost estimate
30 Design Review (SEP / DRP-DR Developer)-
Development is More than 10 Residential Units or Commercial12,555
Development is 10 Residential Units or Less8,050
31 Hydraulic Planning Analysis and System Planning Forecast-
Basic Project Category (per Development Services Code)12,775
Moderate Project Category (per Development Services Code)17,815
Complex Project Category (per Development Services Code)21,710
32 Extra Review Fees-
Per SEP Plan Review/ DRP-DR Developer-
Extra Review Minor (additional reviews of unsigned or signed plans per review)4,015
Extra ReviewMajor/Splitting (additional reviews of unsigned or signed plans per
review)
7,000
Per Site Utility/Minor Utility Additional Unsigned or Signed Plan Review-
Site Utility (per review)2,745
Minor Site Utility (per review)735
Per Hydraulic Planning Analysis/Systems Planning Forecast Application-
Additional Review of Required Data - HPA/SPF/Non-DR Developer (per review)2,675
33 In-House Design Deposit DepositDeposit
34 Partial Certificate of Sustantial Completion Release Fee
(up to 50% of construction)
2,065
35 Off-Property Service Connection ReimbursementReimbursement
36 Service Connection Application and Inspection Fee (per permit)2,675
37 Government Referred Plan Review-
Major Development - Over 10 Units2,155
Minor Development - 10 or Less Units925
Re-Review Fee for Major Development925
Re-Review Fee for Minor Development460
38 Pre-Screen Fee All Development Service Division Plan Types480
Plumbing/Fuel Gas Plans Reviews Pre-Screen Fee230
39 Site Utility (On-site) Review Fees-
Base Fee6,170
Additional Fee per 100 feet520
Minor (Waived) Site Utility (On-Site) Fee2,385
40 Name/Transfer of Ownership Change Fee410
41 Variance Review Fee1,815

Pipeline, Engineering and Environmental Services

Charge Number and NameFY 2027 Approved Fee
42 Shutdown/Charge Water Main Fee1,645
Shutdown Complex Water Main Fee5,280
43 Review and Inspection Fees for Site Work Potentially Impacting WSSC Water Pipelines-
Minor Project Review - Relocation455
Complex Review / Non-DR Developer Review6,220
Inspection for Site Work - Minor Adjustment / Non-DR Developer (per inspection)815
Design Review Major Projects - Requiring New MOU12,555
Major Project Review2,820
44 Connection Abandonment Fees-
County Roads (except Arterial Roads) - Water2,545
County Roads (except Arterial Roads) - Sewer3,235
State Roads and County Arterial Roads - Water3,060
State Roads and County Arterial Roads- Sewer3,805
45 Chlorination Confirmation Test Fee (per first test)300
Re-Test or Additional Tests (per hour)250
46 Re-Test or Additional Tests Chlorination and Pressure Test (per test) 
Inspector Overtime (per hour)
250
Inspector Overtime (per hour)260
47 Review Fee for Additional Reviews of Contract Documents As-Builts
(per hour)
206
48 Residential Outside Meter Housing Upgrade/Pipe Alteration7,140
49 Utility Erosion and Sediment Control Permit Fees (per linear foot)-
Minor Projects (<125 linear foot OR less than 42 inch deep and 20 inch width)0.45
Major Projects0.45
Minimum Charge for Major Projects120
50 Right-of Way Release (or Subordination) Review Fee (per document)1,980
51 Right-of Way Acquisition and Condemnation for SEP ProjectsReimbursement
52 Environmental Site Review Fee-
With Database Search Submitted by Applicant615
53 Feasibility Report and Committee Review Fee for On-Site Takeover
Projects
3,245

Publications and Administrative

Charge Number and NameFY 2027 Approved Fee
54 Plans, Plats and 200' Reference Maps Copies-
Xerographic bond paper copy (per sheet)10
55 WSSC Water Plumbing and Fuel Gas Code (Plumbing Code)-
Sale of Plumbing Regulation (per book)70
56 Contract Specifications, Contract Specification Books, Drawings, Design
Manuals, Standard Details and General Conditions
-
Construction Specifications/Drawings-
Utility Contracts (up to $20)11 - 20
Facility Contracts (up to $450)40 - 450
Construction Standard Details105
Construction General Conditions & Standard Specifications110
SEP Construction General Conditions & Standard Specifications110
Procurement Specifications/Drawings/General Conditions-
With Routine SpecificationsNo charge
With Complex/Voluminous Specifications (up to $200)40 - 200
57 Photocopies of WSSC Water Documents Charges-
Readily Available Source Material (per single sided page)0.30
Certified Copy of Readily Available Source Material (per single sided page)0.60
Scanning Documents (per single sided page)0.30
(A reasonable fee may be charged for time in excess of two hours expended by
WSSC Water in searching for requested records or preparing such records for
inspection and copying)
-
58 WSSC Water Pipeline Design Manual Fee-
59 WSSD Laws-
Bound Volume90
60 Transcribed Tape of a Hearing or Meeting FeePrevailing fee charged by vendor

Other Fees and Charges

Charge Number and NameFY 2027 Approved Fee
61 Watershed Regulation Violation Civil Citation Fines (State Mandated)-
First Offense150
Each Additional Offense within Calendar Year
 
300
62 General Regulation Violation Civil Citation Fines (State Mandated)-
First Offense250
Second Offense500
Third Offense750
Each Violation in Excess of Three1,000
63 Lobbyist Registration Fee (Code of Ethics)125
64 Dishonored Check Fee & Electronic Payment Fee
(applies to all dishonored checks and dishonored electronic payments)
35
65 Credit Card Surcharge (Applies to customer payment of the Point-of-Sale fee/charge by credit card other than water and sewer billing)-
66 Protest Filing Fee1,080
67 Preparation of Hold Harmless Agreement Fee2,505
68 Connection Redemption Fee60
69 Financial Disclosure Filer Late Fee (per day/$500 max)5
70 Antennas on Commission Structures-
New or Modification to Existing Site Application Fee5,000
New or Modification to Existing Site Inspection Fee (per hour)85
New or Modification to Existing Site Modification FeeActual Cost + 20%
Last Modified: July 9, 2026, 1:19 pm EDT