alert
Customer Service Call Center Closed May 28-29
1779309000

For 2-day customer experience workshop

close
[Image]
Group of three WSSC Water employees, wearing appropriate safety gear including hardhats and reflective vests, study a document one of them holds. A WSSC Water truck and orange traffic cones are in the background.

Project Purpose

To enhance service reliability of the water system and to provide safe, clean drinking water, WSSC Water is replacing our aging infrastructure. This project is replacing 3.05 miles of 16-inch and 30-inch diameter water main.

Project Schedule

Winter 2026 – Spring 2026

Project Status

Construction is 98% complete. 

Construction is ongoing at the Old Branch Avenue and Allentown Road intersection to complete the final tie-in. 

Final paving and striping is anticipated to occur in summer 2026, weather permitting.

Key Contacts

WSSC Water Contract Supervisor 

Tim Allen
301-206-7316 
[email protected]

WSSC Water Onsite Inspector 

Lisa Feronti 
202-578-6498 
[email protected]

[Image]
Old Branch Avenue Transmission Water Main. The thick line (light blue) shows the transmission water main area. The line runs on Old Branch Avenue from Allentown Road to Woodyard Road.

 

Last Modified: May 19, 2026, 12:18 pm EDT