Conveyance System (Northern Portion) – Contract No. CT4231F05

Inside view of an intermediate jacking station within the tunnel. This is used to help move the pipe string along in addition to the main jacks at the shaft.

Laborer shown grinding a smooth edge to make the final connection within the tunnel.

 

Contractor makes final connections inside part of a valve vault.

Placing fabric and surge stone over installed pipe to aid in storm water management located along Route 210.