Preliminary Fees
|
Amendments
(project revision) |
An amendment must be obtained should the applicant want to make changes after issuance of the 'Letter of Findings' such as but not limited to: increasing the # of units or parts, changes to the layout, switching project type (WSSC Built or SEP.) Project changes requiring new hydraulic planning analysis (HPA) will also require additional payment of HPA fee. |
$325 |
| Database Search and Contamination Assessment |
Database Search and Initial Assessment for Possible Contamination. |
$300 |
| Government Referred Plan Review (major) |
Major Development – over 10 units or commercial. |
$1,100 |
| Government Referred Plan Review (minor) |
Minor Development – 10 or less residential units. |
$550 |
| Hydraulic modeling (W&S, 1- 3 parts) |
Hydraulic modeling for proposed water and sewer extension must be reviewed by WSSC to ensure that sizes, alignments, etc. are compatible with WSSC’s Systems and with planned development. (Glossary) |
$975 |
| Hydraulic modeling (W/S, 1- 3 parts) |
Hydraulic modeling for proposed water (only) or sewer (only) extension must be reviewed by WSSC to ensure that sizes, alignments, etc. are compatible with WSSC’s Systems and with planned development. |
$550 |
| Development parts (over 3) |
* For each additional part beyond 3. |
$425
*see Description |
| Pressure sewer system surcharge |
Each pressure sewer main that connects to a gravity sewer main via a transition manhole is defined as a separate system. |
$225
per system |
| Basic (W&S) |
Open Hydraulic Planning Analysis and Amendments for both water and sewer. |
$300 |
| Basic (W/S) |
Open Hydraulic Planning Analysis and Amendments for water or sewer only. |
$150 |
| Moderate (W&S) |
Open Hydraulic Planning Analysis and Amendments for both water and sewer. |
$1,000 |
| Moderate (W/S) |
Open Hydraulic Planning Analysis and Amendments for water or sewer only. |
$500 |
| Complex (W&S) |
Open Hydraulic Planning Analysis and Amendments for both water and sewer. |
$2,600 |
| Complex (W/S) |
Open Hydraulic Planning Analysis and Amendments for water or sewer only. |
$1,300 |