|
Adobe Reader is required to view these documents.
Download Acrobat here for free.
Print Section IV Details
View Superceded 2005 Water Standard Details.
- Method of Testing Water Mains W/1.0
- 2-inch Air Valve in Manhole for 24-inch Diameter and Smaller Pipe W/2.0
- Vent Box for Extended Air Release Pipe W/2.0a
- Vent Box for Air/Vacuum Valve Vault On 30" Diameter and Larger Pipes W/2.0b
- Adjustable Valve Box Round Head Sliding Type W/2.1
- Extension Stems and Valve Boxes for Deep Valve Settings W/2.2
- 20-inch, 24-inch, 30-inch and 36-inch Horizontal Valve Installations W/2.4
- 20-inch, 24-inch, 30-inch and 36-inch Horizontal Valve Installations W/2.4a
- Cast in Place Concrete Vault for 20-inch and 24-inch Horizontal Valves W/2.5
- Cast in Place Concrete Vault for 30-inch and 36-inch Horizontal Valves W/2.5a
- 20-inch Vertical Valves Installation W/2.6
- Cast in Place Concrete Vault for 20-inch Vertical Valves W/2.7
- Polyethylene Encasement at Concrete Interface W/2.8
- Type "A" Blowoff for Water Mains 16" to 30" W/3.0
- Endwall for Type "B" Blowoff W/3.01
- Type "A" Blowoff for Water Mains 36-inch and Larger W/3.02
- Type "B" Blowoff for Water Mains 36-inch and Larger W/3.03
- Type "B" Blowoff Profiles for Water Mains 16-inch and Larger W/3.04
- Piping Support at Welded-on Connection W/3.05
- Welded-on Connection for Blowoffs on Mains 36" and Larger W/3.06
- Pressure Reducing Valve Vault Type "1" Layout W/4.2
- Pressure Reducing Valve Vault Type "2" Layout W/4.3
- Type 1 and 2 Pressure Reducing Valve Vault Piping Layout W/4.4
- Pressure Relief Valve Vault W/4.5
- EndWall for Pressure Relief Valve Piping W/4.6
- 4”, 6” and 8” F.M. Meter Vault. June 12, 2009) W/5.0
- 4”, 6”and 8” F.M. Meter Vault Piping Layout. (June 12, 2009) W/5.0a
- 4” F.M. Meter with Check Valve Vault. (June 12, 2009) W/5.0b
- 6” and 8” F.M. Meter with Check Valve Vault. (June 12, 2009) W/5.0c
- 4”, 6” and 8” F.M. Meter with Check Valve Vault Piping Layout. June 12, 2009) W/5.0d
- Remote Reading Device for Meter location in Roadway. (June 12, 2009) W/5.0e
- 3” Compound Meter Vault. (June 12, 2009) W/5.1
- 4” Compound Meter Vault. (June 12, 2009) W/5.1a
- 6” Compound Meter Vault. (June 12, 2009) W/5.1b
- 3”, 4” and 6” Compound Meter Vault Piping Layout. (June 12, 2009) W/5.1c
- Cast in Place and Precast Concrete Top Slab Reinforcing Details W/5.2
- Cast in Place and Precast Concrete Top Slab Reinforcing Details W/5.21
- Cast in Place and Precast Concrete Top Slab for type "1" layout pressure reducing valve vaults W/5.22
- Cast in Place and Precast Concrete Top Slab for type "2" layout pressure reducing valve vaults W/5.23
- Cast in Place and Precast Concrete Top Slab for FM Meter and Detector Check Vaults. (June 12, 2009) W/5.24
- Cast in Place and Precast Concrete Top Slab for Compound Meter and FM meter with Check Valve Vaults. (June 12, 2009) W/5.25
- Cast in Place Concrete Vault. (June 12, 2009) W/5.3
- Cast in Place Concrete Vault. (June 12, 2009) W/5.4
- Top Slab Details for Vaults. (June 12, 2009) W/5.5
- 3/4" Meter Setting for 1" Service W/5.6
- 1" Meter Settings for 1"- 1½" Service W/5.7
- 1 - 1/2" Meter Settings for 2" Service W/5.8
- 2" Meter Setting for 4" Service W/5.9
- 1", 1-1/2" and 2" Water House Connections for Inside Meters W/5.10
- 1", 1-1/2" and 2" Water House Connections for Inside Meters, Rural Type Paving Section W/5.11
- 3-inch Thru 12-inch Ductile Iron Water House Connection W/5.12
- Location of Outside Meters for 1", 1½" & 2" Water House Connections Closed Paving Section W/5.13
- 1", 1 1/2" and 2" Water House Connections and Outside Meter Locations Rural Paving Section W/5.14
- Double Meter Setting ¾" W/5.15
- Double 1" Meter Setting W/5.15a
- Ductile Iron Pipe Load Chart W/6.0
- Polyvinyl Chloride (PVC) Pipe (AWWA C900/905) Load Chart W/6.1
- Inside Water Meter Setting 1-inch and Smaller W/7.1
- Inside Water Meter Setting 1 1/2-inch W/7.2a
- Inside Water Meter Setting 1 1/2-inch W/7.2b
- Inside Water Meter Setting 2-inch W/7.3a
- Inside Water Meter Setting 2-inch W/7.3b
- 3-inch and Larger Indoor Meter Installations W/7.4
- 3-inch and Larger Indoor Meter Installations W/7.5
- Indoor F.M. Meter Installation W/7.6
- Indoor F.M. Meter Installation W/7.7
- Detector Check Meter Indoor Installation W/7.8
- Fire Hydrant Setting Closed Paving Section W/8.0
- Fire Hydrant Setting Open Paving Section W/8.1
- Precast Concrete MH for Pitometer Survey W/9.0
- Air/Vacuum Valve Vault On 30" Diameter and Larger Pipes W/10.0
- Details for Air/Vacuum Valve Vault on 30" Diameter and Larger Pipes W/10.1
- Air/Vacuum Valve Vault On 30" Diameter and Larger Pipes W/10.2
- Entry Port Vault for 36" to 48" Diameter Pipes W/10.3
- Blind Flange Details for Entry Port Vaults W/10.4
- Air/Vacuum Valve Vault and Entry Port Vault for 36" to 48" Diameter Pipes W/10.5
- Concrete Vault for Entry Ports W/10.6
- Cast In Place and Precast Concrete Top Slab Reinforcing for Entry Port Vaults W/10.7
- Pipe Closure Joint Detail Using MJ Solid Sleeves W/11.0
- 4-inch, 6-inch, 8-inch and 10-inch Detector Check Vault for the Replacement of Existing Detector Check Only. (June 12, 2009) W/12.0
- Detector Check Vault Piping Layout for Replacement of Existing Detector Check Vaults Only. (June 12, 2009) W/12.0a
|