Plumbing and Gasfitting Plans
Plumbing and Fuel Gas plans are required for all commercial construction. The code official shall have the authority to waive submittal requirements. Typically commercial work with 10 or less permit items, including gas appliances, may be waived.
Plans that will not be waived include:
- Plans that require FOG (fats, oils, and grease abatement)
- Fuel gas plans that have more than 3 appliances on the entire gas system and/or any of the gas appliances are over 200,000 Btu input.
Submittal Requirements (to Plumbing Plan Review office):
Two sets including floor plans to scale, schematics for fuel gas, waste and vent and water piping, riser diagrams, and where appropriate, details such as meter room layout, equipment schedules, backflow prevention device details, elevations and site plans, material and fixture specifications, fixture clearances etc. Submittals must also include a completed checklist as well as a permit application signed by a registered WSSC Master Plumber/ Gas Fitter. More information about the Permitting process.

|