| [Image]   Looking inside of the Swan Creek Valve Vault, south of Swan Creek Rd. along Route 210. | [Image]   | 
| [Image]   Contractor installing 60” fiberglass reinforced pipe 17ft below grade inside of 8ft trench boxes south of Old Fort rd. along Route 210. | [Image]   Contractor installing two 48” 45 degree bends to achieve proper alignment into the next vault south of Old Fort Rd. along Route 210. [Image]   The 60” tunnel boring machine (TBM) dubbed the Broad Creek Brawler, holes through on the North Bound side of Route 210. | 
Meet the “Broad Creek Brawler” the micro tunnel boring machine currently boring a tunnel on the west side of MD 210 south of Swan Creek Road. The tunnel will end at the Broad Creek Wastewater Pumping Station.
| [Image]   | [Image]   | 
| [Image]   | [Image]   | 