| [Image]   Inside view of an intermediate jacking station within the tunnel. This is used to help move the pipe string along in addition to the main jacks at the shaft. | [Image]   
 | 
| 
 Contractor makes final connections inside part of a valve vault. | 
 Placing fabric and surge stone over installed pipe to aid in storm water management located along Route 210. | 