|
|
|
Western Branch Advanced Wastewater Treatment Plant (WWTP)
2001
Average daily flow = 18.0 million gallons per day
Average daily production of biosolids = 55.8 wet tons
Average % solids = 25.0
Stabilization method - Incineration
Mission
Our mission is to operate the Western Branch
Wastewater Treatment Plant to produce a quality effluent
which meets all discharge standards and to safely dispose of the
biosolids generated in our processes. This is to be done safely,
cost effectively, and in a responsible manner, thus protecting
the environment.
History
1970-5mgd
1973-15mgd plant with biological treatment, filters, chlorine contact
1980-30 mgd nitrification
1991-Denitrification
Unique Features
- No Primary Clarifiers
- 3 Sludge System
- Stringent Effuent Requirements
- WSSC's First Nutrient Removal Plant
Other Features
(You will need Adobe Reader to view these items. Click here for free download of Adobe Acrobat Reader.)
|
With any questions or concerns,
Brian Mosby or contact him directly at (301)206-7565
|